What this guide covers
This guide covers surveying and quantity planning. Work on connected wiring, conductor selection and final verification need an assessed installation design. Do not pull existing wires to discover where they lead.
Draw the start and finish on a floor plan. Mark whether the conduit is new and empty or part of an existing installation. Add visible junction boxes, bends and obstructions. Leave an unknown section marked unknown; do not open electrical boxes merely to finish the drawing. A blockage is a reason to investigate. It can indicate a tight bend, restricted space, damage or unsuitable material. Pulling harder can damage insulation without resolving the cause. Do not improvise with lubricants unless the relevant product manufacturers allow them. You can add their lengths for stock records, but a continuous run still needs sufficient suitable cable on one reel. Do not introduce joints simply to use up leftovers.

Copy or print your summary
This guide covers surveying and quantity planning. Work on connected wiring, conductor selection and final verification need an assessed installation design. Do not pull existing wires to discover where they lead.
Record each route separately
Draw the start and finish on a floor plan. Mark whether the conduit is new and empty or part of an existing installation. Add visible junction boxes, bends and obstructions. Leave an unknown section marked unknown; do not open electrical boxes merely to finish the drawing.
Measure along the intended wall and ceiling route, including vertical sections. The straight-line distance between two points will rarely be the ordering length. Note any section that cannot be inspected until another trade has completed its work.
The electrician determines the cable or conductors, conduit suitability and installation method. Prysmian's cable-selection guidance considers load, installation method and length among other factors. A quantity estimate does not make that design decision.
Keep a separate line for every specification
Suppose measured sections are 4.2, 2.8 and 1.5 metres: a total of 8.5 metres. If an allowance of 0.3 metres at each end has been agreed for this route, the base quantity is 9.1 metres. A user-selected 10% purchasing contingency produces an estimate of 10.01 metres.
That percentage is an example, not an electrical standard. If three different conductors are specified, record three separate 10.01-metre lines. A single line saying “30.03 metres of wire” omits the information needed to buy it. Round to retail quantities only after the exact product is known.
The Dutch term installatiedraad refers to installation wire; trekveer is the pulling tool. Check conductor cross-section in mm², colour, conductor class, insulation and product reference. Conduit outside dimensions use mm. Pipelife's electrical systems include different conduit families; nominal dimensions alone do not establish how readily a route can be pulled.
What to have ready
For surveying, use a tape measure, pencil, floor plan and available installation records. The eventual work may need the specified wires, an appropriate pulling tool, conduit fittings, boxes, connectors and verification equipment. Their quantities depend on the design, so there is no universal shopping kit for this job.
A blockage is a reason to investigate. It can indicate a tight bend, restricted space, damage or unsuitable material. Pulling harder can damage insulation without resolving the cause. Do not improvise with lubricants unless the relevant product manufacturers allow them.
Agree who will inspect the route before walls are closed and who will verify the completed installation. Keep an updated route drawing with the property records.
Common questions
Can I use existing wiring as a draw wire?
A general guide cannot establish whether that is appropriate. Its function, condition, connected equipment and isolation arrangements need assessment first.
Can I combine shorter reels?
You can add their lengths for stock records, but a continuous run still needs sufficient suitable cable on one reel. Do not introduce joints simply to use up leftovers.
Should I buy larger conduit just in case?
A different size also changes fittings and space requirements. Ask for the specified conduit system before buying.
Discuss your cable route with CAS if you would like the pulling, connections and checks included in the work. Describe which sections are new and which remain uncertain.
Materials and specifications
Before buying, check that the size, type and specification suit your installation. Use the article list and tools to work out the quantities you need.
Tape measure and plan

- Quantity and unit
- One tape measure and current plan
- Specification
- Survey accessible surfaces only; measurements do not establish electrical suitability.
Manuals and model details
- Quantity and unit
- One current manual per exact product
- Specification
- Use exact model/revision, with conflicting instructions unresolved until manufacturer/installer clarification.
Electrical conduit
Specified by the electrician- Quantity and unit
- Measured route plus agreed allowances and checked cutting plan
- Specification
- Exact system, nominal/inside dimensions, fittings, pullability and thermal design; prewired variants are not automatically interchangeable.
- KARWEI · Elektriciteitsbuizen
View range - KARWEI · Martens elektrabuis wit 16 mm, 2 meter
View product - KARWEI · Handson voorbedrade buis 16 mm, 3 × 2,5 mm², 12,5 meter
View product
Installation wire or cable
Specified by the electrician- Quantity and unit
- Separate measured quantities per complete specification
- Specification
- Conductor material/class/cross-section, colours, insulation, installation method and product approval; never infer from wattage alone.
- Elektramat · Alle kabels
View range - HORNBACH · Draad & kabels
View range - KARWEI · Installatiekabels
View range
Plan route quantities
Keep each material, colour and cross-section separate. Specification is still required. A total is not a cutting plan, continuous reel length or conduit-fill calculation. Allowances and contingency are your planning choices, not installation rules.
Worked example and formula
4.2 + 2.8 + 1.5 m plus two 0.3 m allowances = 9.1 m. With a user-chosen 10% contingency: 10.01 m. A 4 m light line and 1.2 m supply route stay separate.
planned m = (sum of measured m + explicit allowances m) × (1 + contingency / 100)
Formula version 2026-10-05.1
Sources
Would you like CAS to carry out the work?
Tell us about the room, equipment and changes you need. Agree the work, checks and warranty terms before the job starts.
Discuss the workIn the event of fire or immediate danger: move to safety and call 112. Do not wait for a form reply.